Our Projects

DARcor is the electrical engineering subconsultant for Dibble Engineers on ADOT’s On-Call services contract which has included design and construction oversight services for a total of 11 rest areas located across the state of Arizona. Design improvements included upgrades to each rest area’s potable water storage and pumping systems, electrical...

ADOT Rest Area Rehabilitation

Electrical Engineering worked with GHD and EPCOR to assess the available electrical capacity to upgrade the existing booster pumps at Corte Bella Water Plant....

Corte Bella Water Plant Electrical Capacity Study

Control panel built and programmed a lake fill PLC and two lighting control panels, instrumentation for a stilling well, and an irrigation autodialer control panel. Adding a revision to the RTU control panel drawings and layout, and additional installation of a 2-position selector switches.            ...

East Mesa City Park

In 2021, DARcor was retained as the prime engineering consultant by EPCOR to perform a study to identify any restrictions and requirements for the construction of a SCADA radio tower at one of their operation centers. Deliverables included a formal feasibility study. Extensive coordination was undertaken with surrounding Authorities Having...

EPCOR Agua Fria Operations Center (AFOC) SCADA Tower

Electrical engineering designed the electrical and instrumentation for a new water filling station being constructed in Desert Hills. The design will include an RTU cabinet with PLC and operator interface, control valves, a flowmeter to enable users to access and obtain the desired amount of water, two motorized gates, lighting,...

EPCOR Desert Hills Truck Fill Station

Darcor built a Solenoid control panel for EPCOR. The control panel is wall-mounted and contains a PLC, an HMI, an unmanaged Ethernet switch, a power supply, selector switches, push-to-test pilot devices, air solenoids, and a pressure gauge....

EPCOR Pecan WRF Solenoid Control Panel

Darcor provided designs for electrical, instrumentation, and controls for the Rauch Lift station in Agua Fria, Arizona. The project consists of an RTU cabinet that will continuously monitor the lift station, relocation of the Mission Autodialer and cellular modem/antenna. And removing the existing PLC cabinet. The sewage pumps will be...

EPCOR Raunch Lift Station Improvements

Darcor built an RTU Control Panel for the Rio Verde Booster pump station. The panel included a free-standing NEMA 4 Enclosure, an outdoor Air Conditioner, a PLC with input and output modules, an OIT, an Ethernet switch, a temperature transmitter, circuit protection and fusing, a power supply, a backup battery,...

EPCOR Rio Verde BPS RTU

Responsibilities included engineering design for a 2.1 MG storage reservoir, a booster pump station, and provisions for an on-site well and an arsenic removal system for Buckeye, Arizona. DARcor is currently working on the design of the arsenic removal system. The project also included two off-site wells (Wells No.1 &...

Floreo Water System

The control panel shop built the RAS, ALS, and RSPS programmable logic controller cabinet and the pump alarm panel. Also, providing instrumentation and spare equipment for the Glendale Airport Lift Station. Equipment was added to the network panel: pressure transmitters, flowmeter/transmitter, pressure switches with transducer bases, HMI screens, port-managed Ethernet...

Glendale Airport Lift Station

We provided plans for the new arena cover, which included a new service entrance section, a wireless-controlled arena, parking lot lighting, emergency lighting with an uninterruptible power supply (UPS) system, and an on-site lift station with controls. It was a pleasure to work with the Smith Engineering team and the...

Grants Rodeo Arena

Control panels were built for a PLC and a water lube cabinet, and instrumentation was provided for the Liberty Water Well 19B. The PLC panel includes a mission autodialer. Additional DI and AI modules, terminal blocks, circuit protection, surge suppressors, and wiring were added to the PLC rack. Instrumentation consists...

Liberty Water Well 19B Equipping