Instrumentation and control built a control panel for a PLC and a water lube cabinet, and instrumentation was provided for the Liberty Water Well 19B. The PLC panel includes a mission autodialer. Additional DI and AI modules, terminal blocks, circuit protection, surge suppressors, and wiring were added to the PLC...
Instrumentation and Controls built and programmed an RTU and a Duplex VFD panel and provided instrumentation for the Global Water Moonlight Ridge Lift Station. The RTU panel included PLC, an air-conditioning unit, intrinsically safe relays, digital input, panel meters for pressure display, a backup float control circuit with push-button pilot...
DARcor provided electrical engineering design/build services for a new facility consisting of an ion exchange-type nitrate removal system that treats 1,850 gallons per minute (gpm), a 2 million-gallon (MG) storage reservoir, and a booster pump station that delivers 7,500 gpm for the Arizona Water Company’s water distribution system located in...
The Electrical Engineering Design team provided the plans for the restroom building lighting, light switches, exhaust fan, exhaust fan thermostat, air conditioning unit, and instant water heater. The E-One-style lift station is located near the restroom building and includes a packaged control panel. Power and controls for the replacement of...
Control panels built PLC cabinets for the Booster Pump 1-3 starters, the BW starter, the A/C starter, the well pump starter, an Arsenic Treatment OIT Cabinet, the well 3 hydro tank compressor, and a dual sump control panel. They also did the programming for Well 3 and the Booster pump...
Electrical Design and Construction support included the Admin building, Armijo pond, Bluestake, Chlorine contact basin, Clancy street lift station, Dispatch center, Effluent FM building, Generator, Grit removal, Headworks, Lower zone tank repeater, Maintenance building, MCC building, MIMS vacuum station, new influent location, Nickel Street LS, Office trailer, Ox Ditch, Polymer...
Electrical Engineering provided a design for a new liquid-phase odor-control dosing system located near the Town of Gilbert’s existing North Water Treatment Plant site. The ferric chloride odor control system consisted of a 1300-gallon storage tanks, dosing pumps, tank mixers, tank level transmitters, packaged pump and mixer motor controls, and...