The Electrical Engineering Design team provided the plans for the restroom building lighting, light switches, exhaust fan, exhaust fan thermostat, air conditioning unit, and instant water heater. The E-One-style lift station is located near the restroom building and includes a packaged control panel. Power and controls for the replacement of the existing drain pump station control panel with a sewage lift station control panel, complete with I/O signals for remote monitoring and control from the nearest located PLC or remote I/O cabinet. A submersible level transducer is located in the existing drain pump station’s wet well, and a magnetic flowmeter for the existing drain pump station discharge line.






