Our Projects

Electrical Engineering worked with GHD and EPCOR to assess the available electrical capacity to upgrade the existing booster pumps at Corte Bella Water Plant....

Corte Bella Water Plant Electrical Capacity Study

Electrical engineering designed the electrical and instrumentation for a new water filling station being constructed in Desert Hills. The design will include an RTU cabinet with PLC and operator interface, control valves, a flowmeter to enable users to access and obtain the desired amount of water, two motorized gates, lighting,...

EPCOR Desert Hills Truck Fill Station

Darcor built an RTU Control Panel for the Rio Verde Booster pump station. The panel included a free-standing NEMA 4 Enclosure, an outdoor Air Conditioner, a PLC with input and output modules, an OIT, an Ethernet switch, a temperature transmitter, circuit protection and fusing, a power supply, a backup battery,...

EPCOR Rio Verde BPS RTU

Control panels were built for a PLC and a water lube cabinet, and instrumentation was provided for the Liberty Water Well 19B. The PLC panel includes a mission autodialer. Additional DI and AI modules, terminal blocks, circuit protection, surge suppressors, and wiring were added to the PLC rack. Instrumentation consists...

Liberty Water Well 19B Equipping

Instrumentation and control built a control panel for a PLC and a water lube cabinet, and instrumentation was provided for the Liberty Water Well 19B. The PLC panel includes a mission autodialer. Additional DI and AI modules, terminal blocks, circuit protection, surge suppressors, and wiring were added to the PLC...

Luke Field Well Pump to Fire Tank

Electrical Engineering and Construction Design Scope: This task consists of developing conceptual design documents for improvements to the existing power, control, instrumentation, and supervisory control and data acquisition (SCADA) system....

Roosevelt Water Conservation District Main Pump Station Improvements

DARcor provided electrical engineering design/build services for a new facility consisting of an ion exchange-type nitrate removal system that treats 1,850 gallons per minute (gpm), a 2 million-gallon (MG) storage reservoir, and a booster pump station that delivers 7,500 gpm for the Arizona Water Company’s water distribution system located in...

Santiago Trail Water Supply Facility Reservoir and Pump Station

The Electrical Engineering Design team provided the plans for the restroom building lighting, light switches, exhaust fan, exhaust fan thermostat, air conditioning unit, and instant water heater. The E-One-style lift station is located near the restroom building and includes a packaged control panel. Power and controls for the replacement of...

Scottsdale Site 42 Lift Station Improvements

Control panels built PLC cabinets for the Booster Pump 1-3 starters, the BW starter, the A/C starter, the well pump starter, an Arsenic Treatment OIT Cabinet, the well 3 hydro tank compressor, and a dual sump control panel. They also did the programming for Well 3 and the Booster pump...

Well 3 and Booster Pump Control Programming

Electrical Engineering provided a design for a new liquid-phase odor-control dosing system located near the Town of Gilbert’s existing North Water Treatment Plant site. The ferric chloride odor control system consisted of a 1300-gallon storage tanks, dosing pumps, tank mixers, tank level transmitters, packaged pump and mixer motor controls, and...

Western Canal Odor Control System