Our Projects

Darcor built an RTU Control Panel for the Rio Verde Booster pump station. The panel included a free-standing NEMA 4 Enclosure, an outdoor Air Conditioner, a PLC with input and output modules, an OIT, an Ethernet switch, a temperature transmitter, circuit protection and fusing, a power supply, a backup battery,...

EPCOR Rio Verde BPS RTU

DARcor provided electrical engineering design/build services for a new facility consisting of an ion exchange-type nitrate removal system that treats 1,850 gallons per minute (gpm), a 2 million-gallon (MG) storage reservoir, and a booster pump station that delivers 7,500 gpm for the Arizona Water Company’s water distribution system located in...

Santiago Trail Water Supply Facility Reservoir and Pump Station

The Electrical Engineering Design team provided the plans for the restroom building lighting, light switches, exhaust fan, exhaust fan thermostat, air conditioning unit, and instant water heater. The E-One-style lift station is located near the restroom building and includes a packaged control panel. Power and controls for the replacement of...

Scottsdale Site 42 Lift Station Improvements

Electrical Design and Construction support included the Admin building, Armijo pond, Bluestake, Chlorine contact basin, Clancy street lift station, Dispatch center, Effluent FM building, Generator, Grit removal, Headworks, Lower zone tank repeater, Maintenance building, MCC building, MIMS vacuum station, new influent location, Nickel Street LS, Office trailer, Ox Ditch, Polymer...

Truth or Consequences WWTP Upgrades

Electrical Engineering provided a design for a new liquid-phase odor-control dosing system located near the Town of Gilbert’s existing North Water Treatment Plant site. The ferric chloride odor control system consisted of a 1300-gallon storage tanks, dosing pumps, tank mixers, tank level transmitters, packaged pump and mixer motor controls, and...

Western Canal Odor Control System