Our Projects

Electrical Engineering worked with GHD and EPCOR to assess the available electrical capacity to upgrade the existing booster pumps at Corte Bella Water Plant....

Corte Bella Water Plant Electrical Capacity Study

Electrical engineering designed the electrical and instrumentation for a new water filling station being constructed in Desert Hills. The design will include an RTU cabinet with PLC and operator interface, control valves, a flowmeter to enable users to access and obtain the desired amount of water, two motorized gates, lighting,...

EPCOR Desert Hills Truck Fill Station

Instrumentation and Controls built and programmed an RTU and a Duplex VFD panel and provided instrumentation for the Global Water Moonlight Ridge Lift Station. The RTU panel included PLC, an air-conditioning unit, intrinsically safe relays, digital input, panel meters for pressure display, a backup float control circuit with push-button pilot...

Moonlight Ridge Lift Station Improvements

Electrical Engineering and Construction Design Scope: This task consists of developing conceptual design documents for improvements to the existing power, control, instrumentation, and supervisory control and data acquisition (SCADA) system....

Roosevelt Water Conservation District Main Pump Station Improvements