In 2021, DARcor was retained as the prime engineering consultant by EPCOR to perform a study to identify any restrictions and requirements for the construction of a SCADA radio tower at one of their operation centers. Deliverables included a formal feasibility study. Extensive coordination was undertaken with surrounding Authorities Having...
Electrical engineering designed the electrical and instrumentation for a new water filling station being constructed in Desert Hills. The design will include an RTU cabinet with PLC and operator interface, control valves, a flowmeter to enable users to access and obtain the desired amount of water, two motorized gates, lighting,...
Control panels built PLC cabinets for the Booster Pump 1-3 starters, the BW starter, the A/C starter, the well pump starter, an Arsenic Treatment OIT Cabinet, the well 3 hydro tank compressor, and a dual sump control panel. They also did the programming for Well 3 and the Booster pump...