DARcor is the electrical engineering subconsultant for Dibble Engineers on ADOT’s On-Call services contract which has included design and construction oversight services for a total of 11 rest areas located across the state of Arizona. Design improvements included upgrades to each rest area’s potable water storage and pumping systems, electrical...
In 2021, DARcor was retained as the prime engineering consultant by EPCOR to perform a study to identify any restrictions and requirements for the construction of a SCADA radio tower at one of their operation centers. Deliverables included a formal feasibility study. Extensive coordination was undertaken with surrounding Authorities Having...
Electrical engineering designed the electrical and instrumentation for a new water filling station being constructed in Desert Hills. The design will include an RTU cabinet with PLC and operator interface, control valves, a flowmeter to enable users to access and obtain the desired amount of water, two motorized gates, lighting,...
We provided plans for the new arena cover, which included a new service entrance section, a wireless-controlled arena, parking lot lighting, emergency lighting with an uninterruptible power supply (UPS) system, and an on-site lift station with controls. It was a pleasure to work with the Smith Engineering team and the...
Control panels were built for a PLC and a water lube cabinet, and instrumentation was provided for the Liberty Water Well 19B. The PLC panel includes a mission autodialer. Additional DI and AI modules, terminal blocks, circuit protection, surge suppressors, and wiring were added to the PLC rack. Instrumentation consists...
Instrumentation and control built a control panel for a PLC and a water lube cabinet, and instrumentation was provided for the Liberty Water Well 19B. The PLC panel includes a mission autodialer. Additional DI and AI modules, terminal blocks, circuit protection, surge suppressors, and wiring were added to the PLC...
DARcor provided electrical engineering design/build services for a new facility consisting of an ion exchange-type nitrate removal system that treats 1,850 gallons per minute (gpm), a 2 million-gallon (MG) storage reservoir, and a booster pump station that delivers 7,500 gpm for the Arizona Water Company’s water distribution system located in...
Electrical Engineering provided a design for a new liquid-phase odor-control dosing system located near the Town of Gilbert’s existing North Water Treatment Plant site. The ferric chloride odor control system consisted of a 1300-gallon storage tanks, dosing pumps, tank mixers, tank level transmitters, packaged pump and mixer motor controls, and...