Our Projects

DARcor is the electrical engineering subconsultant for Dibble Engineers on ADOT’s On-Call services contract which has included design and construction oversight services for a total of 11 rest areas located across the state of Arizona. Design improvements included upgrades to each rest area’s potable water storage and pumping systems, electrical...

ADOT Rest Area Rehabilitation

Electrical Engineering worked with GHD and EPCOR to assess the available electrical capacity to upgrade the existing booster pumps at Corte Bella Water Plant....

Corte Bella Water Plant Electrical Capacity Study

In 2021, DARcor was retained as the prime engineering consultant by EPCOR to perform a study to identify any restrictions and requirements for the construction of a SCADA radio tower at one of their operation centers. Deliverables included a formal feasibility study. Extensive coordination was undertaken with surrounding Authorities Having...

EPCOR Agua Fria Operations Center (AFOC) SCADA Tower

Electrical engineering designed the electrical and instrumentation for a new water filling station being constructed in Desert Hills. The design will include an RTU cabinet with PLC and operator interface, control valves, a flowmeter to enable users to access and obtain the desired amount of water, two motorized gates, lighting,...

EPCOR Desert Hills Truck Fill Station

Responsibilities included engineering design for a 2.1 MG storage reservoir, a booster pump station, and provisions for an on-site well and an arsenic removal system for Buckeye, Arizona. DARcor is currently working on the design of the arsenic removal system. The project also included two off-site wells (Wells No.1 &...

Floreo Water System

We provided plans for the new arena cover, which included a new service entrance section, a wireless-controlled arena, parking lot lighting, emergency lighting with an uninterruptible power supply (UPS) system, and an on-site lift station with controls. It was a pleasure to work with the Smith Engineering team and the...

Grants Rodeo Arena

Control panels were built for a PLC and a water lube cabinet, and instrumentation was provided for the Liberty Water Well 19B. The PLC panel includes a mission autodialer. Additional DI and AI modules, terminal blocks, circuit protection, surge suppressors, and wiring were added to the PLC rack. Instrumentation consists...

Liberty Water Well 19B Equipping

Instrumentation and control built a control panel for a PLC and a water lube cabinet, and instrumentation was provided for the Liberty Water Well 19B. The PLC panel includes a mission autodialer. Additional DI and AI modules, terminal blocks, circuit protection, surge suppressors, and wiring were added to the PLC...

Luke Field Well Pump to Fire Tank

Instrumentation and Controls provided electrical equipment cabinets and RTUs for the Lake Pleasant Water System Improvements. They built an RTU cabinet with a programmable logic controller (PLC), an operator interface terminal (OIT), and a cellular router for the Discovery Center. A Truplex booster pump control panel, a Hydro tank air...

Lake Pleasant Water System Electrical and Control Cabinets

Electrical Engineering and Construction Design Scope: This task consists of developing conceptual design documents for improvements to the existing power, control, instrumentation, and supervisory control and data acquisition (SCADA) system....

Roosevelt Water Conservation District Main Pump Station Improvements

DARcor provided electrical engineering design/build services for a new facility consisting of an ion exchange-type nitrate removal system that treats 1,850 gallons per minute (gpm), a 2 million-gallon (MG) storage reservoir, and a booster pump station that delivers 7,500 gpm for the Arizona Water Company’s water distribution system located in...

Santiago Trail Water Supply Facility Reservoir and Pump Station

Electrical Engineering provided a design for a new liquid-phase odor-control dosing system located near the Town of Gilbert’s existing North Water Treatment Plant site. The ferric chloride odor control system consisted of a 1300-gallon storage tanks, dosing pumps, tank mixers, tank level transmitters, packaged pump and mixer motor controls, and...

Western Canal Odor Control System